This was remodel of a existing of a 30,000 SF building. The existing building needed to be brought up to code. A new 24,000 SF addition was added at the entrance and includes new admin offices, a public lobby and information counter, EOC, new locker rooms, evidence storage and an armory. Resiliency was made a priority, with seismic and code upgrades and updates to the emergency power supply. This building targets LEED-Platinum and is certified to the highest-level of code requirements for civic buildings, including rigorous earthquake safety provisions ensuring that this building will be there to serve during emergencies. The 36,000 square-foot Police Services Building is being constructed at a cost of approximately $15 million and is expected to be complete by the end of this year.